• Skip to main content
  • LESCO Bill
    • About Us
    • LESCO Customer Services
    • LESCO MIS – Developed by LESCO Official Computer Center
    • Jobs in LESCO
    • LESCO Complaint Online
    • LESCO Online Bill Payment
  • LESCO Tariff
  • LESCO Bill Calculator
  • LESCO Net Metering
  • MEPCO Bill
    • MEPCO Bill Calculator
  • IESCO Bill
    • IESCO New Connection
    • IESCO Bill Calculator
    • IESCO Tariff
    • IESCO Customer Services
  • Blog

LESCO Bill

Check Online LESCO Bill

MEPCO Tariff | MEPCO Bill Rates 2024

Last Updated On August 24, 2024 By John Thomas

Are you looking for MEPCO Tariff for your residential, commercial, or industrial connection? We have also

MEPCO Tariff 2024 – Updated Bill Rates

Due to the increasing price of furnace oil, crude oil and fuel, rates of electricity prices are also getting out of control.

This situation has also grabbed all DISCOs as well as MEPCO too. MEPCO, LESCO and K-Electric are also increasing per unit prices day by day.

LESCO Tariff Guide

A-1 GENERAL SUPPLY TARIFF RESIDENTIAL

Sr.CategoryUniform TariffVariable Tariff
i.Up to 50 Units26.0024.95
ii.1 – 100 Units36.5929.74
iii.101 – 200 Units38.4132.06
iv.201 – 300 Units39.5334.15
v.301 – 700 Units41.0731.55
vi.Above 700 Units42.6144.65
b)For Sanctioned loads 5 kW & above
 Time of UsePeak – 20.27
Off-Peak – 13.10
Peak – 22.65
Off-Peak – 16.33

As per the Authority’s decision, residential consumers will be given the benefits of only one previous slab. Under tariff A-1, there shall be a minimum monthly customer charge at the following MEPCO bill rates even if no energy is consumed.

  • Single Phase Connections: Rs. 75/- per consumer per month
  • Three Phase Connections: Rs. 150/- per consumer per month

A-2 General Supply Tariff Commercial

Sr.CategoryUniform TariffVariable Tariff
A.For sanctioned loads less than 5 kW19.5619.95
B.For sanctioned loads 5 kW & above19.2221.63
C.Time of usePeak – 21.02
Off-Peak – 13.49
Peak – 23.55
Off-Peak – 17.58

Under Tariff A-2, there shall be minimum monthly charges at the following MEPCO bill rates even if no energy is consumed.

  • Single Phase Connections: Rs. 175/- per consumer per month.
  • Three Phase Connections: Rs. 350/- per consumer per month.

A-3 General Service

Sr.CategoryUniform TariffVariable Tariff
 ED
a)General Services17.0519.51

Under Tariff A-3, there shall be minimum monthly charges at the following MEPCO bill rates even if no energy is consumed.

  • Single Phase Connections: Rs. 175/- per consumer per month.
  • Three Phase Connections: Rs. 350/- per consumer per month.

Industrial Supply Tariff

Sr.Uniform TariffVariable Tariff
 ED
B118.3117.23
B2(a)17.8716.73
B1(b)Peak – 21.19
Off-Peak – 13.41
Peak – 20.79
Off-Peak – 15.23
B2(b)Peak – 20.95
Off-Peak – 13.50
Peak – 20.73
Off-Peak – 15.02
B3Peak – 21.11
Off-Peak – 12.63
Peak – 20.73
Off-Peak – 14.93
B4Peak – 20.93
Off-Peak – 12.97
Peak – 20.73
Off-Peak – 14.83
  • The B1 Affiliates shall be charged a fixed minimum of Rs. 350/- per month
  • For B2 Affiliates shall be charged a fixed minimum of Rs. 2000/- per month
  • For B3 Affiliates shall be charged a fixed minimum of Rs. 50,000/- per month
  • For B4 Affiliates shall be charged a fixed minimum of Rs. 500,000/- per month

Single Point Supply

Sr.CategoryUniform TariffVariable Tariff
a)Sanctioned load less than 5 KW24.3620.63
b)Sanctioned load from 5 kW & 500 KW21.3120.13
C-2(a)For supply at 11,33 kV up to and including 5000 kW17.0319.93
C-3(a)For supply at 66 kV & above and sanctioned load  above 5000 kW15.1119.83
C-1(c)For supply at 400/230 Volts 5 KW & up to 500 kWPeak – 22.43
Off-Peak – 15.00
Peak – 23.55
Off-Peak – 16.95
C-2(b)For supply at 11,33 kV up to and including 5000 kWPeak – 20.40
Off-Peak – 12.89
Peak – 23.55
Off-Peak – 16.75
C-3(b)For supply at 66 kV & above and sanctioned load  above 5000 kWPeak – 19.51
Off-Peak – 11.68
Peak – 23.55
Off-Peak – 16.65

Agriculture Tariff

SR.CategoryUniform TariffVariable Tariff
D1(a)SCARP less than 5 kW22.9217.63
D2(a)Agricultural Tube Wells17.637.30
D1(b)SCARP 5 kW & abovePeak – 23.76
Off-Peak – 14.25
Peak – 20.55
Off-Peak – 13.30
D2(b)Agricultural 5 kW & abovePeak – 21.44
Off-Peak – 13.04
Peak – 7.30
Off-Peak – 7.30

Under this tariff, there shall be minimum monthly charges of Rs. 2000/-per-consumer per month, even if no energy is consumed.

Note:- The consumers having sanctioned loads less than 5 kW can opt for TOU metering.

For the categories of E-1(i&ii) above, the minimum bill of the consumers shall be Rs.50/- per day subject to a minimum of Rs.500/- for the entire period of supply, if no energy is consumed.

Under Tariff G, there shall be a minimum monthly charge of Rs.500/-per month per kW of lamp capacity installed.

mepco tariff revised rates and guides 2024

MEPCO Unit Rates – MEPCO Tariff 2024

A-1 GENERAL SUPPLY TARIFF RESIDENTIAL

SR.CATEGORYFIXED CHARGESUNIFORM TARIFF VARIABLE CHARGEAPPLICABLE VARIABLE CHARGES
AED
a)For sanctioned load less than 5 kW
iUp to 50 Units–4.003.95
For Consumption exceeding 50 Units
ii1 – 100 Units–14.597.74
iii101 – 200 Units–16.4110.06
iv201 – 300 Units–17.5312.15
v301 – 700 Units–19.0719.55
viAbove 700 Units–20.6122.65
b)For Sanctioned load 5 kW & above–
Time of usePeak – 20.27
Off-Peak – 13.10
Peak – 22.65
Off-Peak – 16.33

As per the Authority’s decision, residential consumers will be given the benefits of only one previous slab.

Under tariff A-1, there shall be a minimum monthly customer charge at the following rates even if no energy is consumed.

a) Single Phase Connections: Rs. 75/- per consumer per month.
b) Three Phase Connections: Rs. 150/- per consumer per month.

A-2 GENERAL SUPPLY TARIFF COMMERCIAL

SR.CATEGORYFIXED CHARGESUNIFORM TARIFF VARIABLE CHARGESAPPLICABLE VARIABLE CHARGES
AED
a)For sanctioned load less than 5 kW19.5619.95
b)For sanctioned load 5 kW & above440.0019.2221.63
c)Time of use440.00Peak – 21.02
Off-Peak – 13.49
Peak – 23.55
Off-Peak – 17.58

Under Tariff A-2, there shall be minimum monthly charges at the following rates even if no energy is consumed.

a) Single Phase Connections: Rs. 175/- per consumer per month.
b) Three Phase Connections: Rs. 350/- per consumer per month.

A-3 GENERAL SERVICES

SR.CATEGORYFIXED CHARGESUNIFORM TARIFF VARIABLE CHARGEAPPLICABLE VARIABLE
AED
a)General Services–17.0519.51

Under Tariff A-3, there shall be minimum monthly charges at the following rates even if no energy is consumed.

a) Single Phase Connections: Rs. 175/- per consumer per month.
b) Three Phase Connections: Rs. 350/- per consumer per month.

B. INDUSTRIAL SUPPLY TARIFFS

SR.FIXED CHARGESUNIFORM TARIFF VARIABLEAPPLICABLE VARIABLE CHARGES
AED
B118.3117.23
B2(a)440.0017.8716.73
B1(b)–Peak – 21.19
Off-Peak – 13.41
Peak – 20.79
Off-Peak – 15.23
B2(b)440.00Peak – 20.95
Off-Peak – 13.50
Peak – 20.73
Off-Peak – 15.02
B3420.00Peak – 21.11
Off-Peak – 12.63
Peak – 20.73
Off-Peak – 14.93
B4400.00Peak – 20.93
Off-Peak – 12.97
Peak – 20.73
Off-Peak – 14.83

For B1 consumers there shall be a fixed minimum charge of Rs. 350/- per month. For B2 consumers there shall be a fixed minimum charge of Rs. 2000/- per month. For B3 consumers there shall be a fixed minimum charge of Rs. 50,000/- per month. For B4 consumers there shall be a fixed minimum charge of Rs. 500,000/- per month.

C. SINGLE-LINE SUPPLY

SR.CATEGORYFIXED CHARGESUNIFORM TARIFF VARIABLE CHARGEAPPLICABLE VARIABLE CHARGES
AED
C-1For supply at 400/230 Volts
a)Sanctioned load less than 5 kW–24.3620.63
b)Sanctioned load from 5 kW & 500 kW440.0021.3120.13
C-2(a)For supply at 11,33 kv up to and including 5000 kW420.0017.0319.93
C-3(a)For supply at 66 kv & above and sanctioned load  above 5000 kW400.0015.1119.83
C-1(c)For supply at 400/230 Volts 5 kW & upto 500 kW400.00Peak – 22.43
Off-Peak – 15.00
Peak – 23.55
Off-Peak – 16.95
C-2(b)For supply at 11,33 kV up to and including 5000 kW420.00Peak – 20.40
Off-Peak – 12.89
Peak – 23.55
Off-Peak – 16.75
C-3(b)For supply at 66 kV & above and sanctioned load  above 5000 kW400.00Peak – 19.51
Off-Peak – 11.68
Peak – 23.55
Off-Peak – 16.65

D. AGRICULTURE TARIFF

SR.TARIFF CATEGORY/PARTICULARSFIXED CHARGES R/S/KW/MUNIFORM TARIFF VARIABLE CHARGE RS/KWHAPPLICABLE VARIABLE CHARGES RS/KWH
AED
D1(a)SCARP less than 5 kW22.9217.63
D2(a)Agricultural Tube Wells200.0017.637.30
D1(b)SCARP 5 kW & above200.00Peak – 23.76
Off-Peak – 14.25
Peak – 20.55
Off-Peak – 13.30
D2(b)Agricultural 5 kW & above200.00Peak – 21.44
Off-Peak – 13.04
Peak – 7.30
Off-Peak – 7.30

Under this tariff, there shall be minimum monthly charges of Rs. 2000/-per-consumer per month, even if no energy is consumed.

Note:- The consumers having sanctioned load less than 5 kW can opt for TOU metering.

E. TEMPORARY SUPPLY TARIFFS

SR.CATEGORYFIXED CHARGESUNIFORM TARIFF VARIABLE CHARGEAPPLICABLE VARIABLE CHARGES
AED
E-1(i)Residential Supply–21.7322.79
E-1(ii)Commercial Supply–19.2320.34
E-2Industrial Supply–18.3818.31

For the categories of E-1(i&ii) above, the minimum bill of the consumers shall be Rs.50/- per day subject to a minimum of Rs.500/- for the entire period of supply, if no energy is consumed.

F. SEASONAL INDUSTRIAL SUPPLY TARIFFS

125% of relevant industrial tariff notes:- Tariff consumers will have the option to convert to Regular Tariff and vice versa. This option can be exercised at the time of a new connection or at the beginning of the season. Once exercised, the option remains in force for at least one year.

G PUBLIC LIGHTING

SR.CATEGORYFIXED CHARGESUNIFORM TARIFF VARIABLE CHARGEAPPLICABLE VARIABLE CHARGES
AED
Street Lighting19.0220.63

Under Tariff G, there shall be a minimum monthly charge of Rs.500/-per month per kW of lamp capacity installed.
H-RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES

SR.CATEGORYFIXED CHARGESUNIFORM TARIFF VARIABLE CHARGEAPPLICABLE VARIABLE CHARGES
AED
Residential Colonies attached to industrial premises–21.0220.63

Frequently Asked Questions

1. What is MEPCO Unit Rate 2024?

The per unit price as per MEPCO electricity tariff is Rs. 24.95 in Pakistan.

2. What is the QTR MEPCO DMC Tariff?

QTR is the quarterly tariff adjustment that shows up every 3 months and should be paid by customers.

Related Posts:

  • MEPCO Bill by Reference No and Customer ID
    MEPCO Bill Online 2024 - Download Duplicate Bill |…
  • mepco-new-connection process
    MEPCO New Connection 2024 | Online Application Procedure
  • MEPCO Bill Calculator - Estimate Your Bill Amount
    MEPCO Bill Calculator - Estimate Your Bill Amount
  • pesco bill reference number
    PESCO Bill Online 2024 | FREE Download Your Duplicate Bill
  • Solar Unit Price - Export Unit Price In Pakistan
    Net Metering Rates in Pakistan | Net Metering Tariff
  • MEPCO Areas Map
    MEPCO Jurisdiction Map | Revised Districts Details
Copyright © 2025 - LESCOBILLONLINE.NET, All Rights Reserved.
Privacy Policy | Disclaimer | Contact Us