THERE are multiple reasons behind the continuing Load Shedding Lahore crisis. Pakistan as a sovereign state remains underprivileged when it comes to electricity production.
People in Pakistan are still facing electric power supply shutdowns. Consequently, controlling the load shedding across Lahore and other relevant regions is the responsibility of LESCO.
LESCO provides authentic material which is particularly based upon a revised power shutdown schedule design.
However, we all agree with the fact that LESCO is also responsible for the unlimited hours’ load shedding in Lahore.
But this problem of load shedding can only be solved if the authorities take serious action against those who are responsible.
Firstly,
Lahore is not a small city, it is a huge urban region comprising almost 11.13 million people. However, Load-Shedding in this specific region is a primary issue or a point of concern.
LESCO on behalf of its readings and net-metering stats finalized in January 2023 version of the power supply as well as the shutdown schedule in Lahore.
Apart from this:
Nonetheless, the schedule is divided into two categories, deposit work, and capital work.
Load Shedding Lahore Schedule 2024
To see the latest load-shedding schedule please see the below document.
APPROVED SHUT DOWN ON 22-08-2024
What is explained in this document?
After thorough research and study, LESCO describes briefly about Load Shedding Lahore in tabular data.
Furthermore, LESCO divided its comprising cities into multiple circles, divisions, and categories.
However, the shutdown table is further divided into numerous columns. That includes the headings:
- Circles
- Operation Sub-Division
- Divisions
- Name of Grid Station
- Name of Feeder
- Date & Time
- Purpose of ShutDown
- Affected Areas
The information enlisted under these headings gives an overall idea regarding the LESCO shutdown plan. However, it is the shutdown plan for both deposit work and capital work. This schedule is not fixed or permanent; it can vary with time.
1. Circles
The heading ‘Circles’ defines the region of Punjab, which is further divided into various localities. Like Northern 1st, Southern, Sheikhpura, Okara, Eastern, Nankana, Kasur, Central, and Northern circles.
2. Operation Sub-Divisions
Likewise, this column is also further divided into sub-contents. That includes divisions like, K. A Malik, Syed Wala, Nishtar Colony, Kot Abdul Malik, Qilla Sattar Shah, Ali Raza Abad, JIA BAGGA, Waris Shah, Basir Pur, Mazhar Abad, M.A Abad, Wahga, Phool Nagar, Mehmood Bhoti, K.K. Saeed, Baghbanpura, and many other subdivisions that come that follow the LESCO shutdown schedule.
3. Constant Divisions
However, the Constant division includes ELR, TLC, SKP, South, Okara, North, DW Kasur, and T&G sectors.
4. Name of Grid Stations
Then the grid Station column indicates the names of the grids like Afco, Ali Jaj, Anayat Pura, Attabad, AWT, Baigpur, Basir Pur, Bata Pur, etc.
5. Name of Feeders
Next comes the column with the Feeder’s name. That includes Gallo Road, Qilla Sattar Shah, Dana Abad, Fareed Abad, Harchoki, Michora, Rajab, Syed Wala, Azam Chowk, State Life-1, 2, 3, Anmol, Al Badar, Bilal Steel, and many more.
The date & time mentioned in the LESCO shutdown schedules is different for grid stations, sub-divisions, circles and feeders.
However, the purpose of shutdown also differs from one area to another. There are several reasons for electricity shutdown within the Lahore, Punjab region. That is explained in detail in the table.
Affected areas also depend upon the purposes of shutdown and other mentioned terms in the table.
Now let’s know more about it:
The problem with LESCO lies when it comes to dealing with multiple circles, subdivisions, and the appointment of grid stations.
Probably, power shutdown schedules are designed and structured due to certain facts and figures. Load shedding is a long-lasting issue within Pakistan.
Reasons Behind the Shutting Down of Electricity
There are multiple reasons behind the shutting down of electricity/load shedding in Pakistan today. All these reasons might differ from area to area or circle to circle.
Consequently, whatever the reasons are, we all believe that it is the responsibility of the government to deal with the issues.
What’s the bottom line?
What are the Reasons behind excessive load shedding in Lahore?
The reasons for the load shedding are:
- Electricity drainage
- Corruption
- Unlimited load demand
- Default in area planning
- Bifurcation of power of 11 kV or more than that
- Erection or installation of pipelines that damage power supply towers or transformers
- Dismantlement of feeders in specific areas
Now we can see that there are diverse reasons behind the shutting down of the electricity. That can perhaps cause an excessive amount of load shedding in the region.
Name of feeders according to the Area planning
Feeders of categories designed by LESCO depend upon area planning and load management that configures AT & C losses.
LESCO is a key negotiator behind deciding the circles and taking into account area planning. Area planning and installation of grid stations are one of the foremost essential items on the LESCO shutdown schedule.
Moreover, to educate the masses about the LESCO load-shedding schedule, it is important to have authentic knowledge. That should rely upon facts and figures as prescribed by LESCO.
Monthly Shutdowns
The table of LESCO has designed a complete grid of information to know about the monthly shutdown of power in Lahore.
Here’s the deal,
LESCO has defined proper timings and dates that focus on load shedding.
All these details define the approach toward power shutdowns and the non-availability of electricity.
LESCO is a decision-maker because it has the authority to deal with the power supply. The people of Lahore have to obey the decisions made by the authorities and find alternatives to meet the power crisis.
LESCO is a powerhouse!
A powerhouse like LESCO provides reliable services when it operates 24/7 in the region like Lahore.
However, it also takes control of the overall load shedding and power shutdowns happening in the city.
Sounds good?
But it is not that good or stimulating because a lot of poor and needy people have to suffer because of the LESCO shutdown schedule.
Load Shedding Management
Load-shedding management is not an easy task. Thus, it requires a lot of homework and research.
Moreover, dealing with the citizens’ outrage is also not as simple as it looks.
Look!
The load management schedule shows that there are no defined timings for the management of power load. Hence, it is proved that the problem lies in the load management sector. Moreover, LESCO does not take regular precautionary measures that can smoothly transmit the power supply.
Secondly,
We came across the fact that authorities are not showing any concern, nor are they applying any energy conservation tactics.
Moreover, it is installing new electricity connections in different localities of the city, leaving damaged connections unattended.
But guess what?
LESCO has installed grid stations along with the appointment of the feeder’s name according to different categories.
But, still, as the population increases, the number of consumers is also increasing.
Therefore, it is the main reason behind the power load on the grid station. Whereas, the LESCO load management team is unable to figure out the power losses exactly.
LESCO Load Shedding Schedule
LESCO load shedding schedule focuses on different patterns and timings according to which the load shedding takes place.
There are proper timetables and schedules followed by the company. That can keep the citizens aware of the idea that when they are going to face an electricity shutdown.
That is why LESCO keeps all the essential information.
LESCO promises certain facts and achievements regarding the onset of the system and the way it works.
Therefore, it has established front desks or call centers through which it can easily entertain its customers.
Plus, the employees can keep records of the load-shedding hours daily as well as monthly.
How to check LESCO’s load-shedding schedule?
There is a solution to your query about how you can check LESCO’s load-shedding schedule. You can easily check/access the load-shedding schedule online without any difficulty.
However, this schedule will be edited and updated from time to time to ensure its authenticity. Here is the link which is already mentioned above. Lahore Shutdown Schedule 2024
Furthermore, you can also access your circle/area load-shedding schedule by simply entering your reference number. It will help you to get basic information regarding the power shutdowns specific to your region.
How can LESCO prevent load shedding in the future?
You must be wondering how can LESCO improve its performance and how can it prevent electricity shutdowns in the future. So let us solve this issue for you. Multiple preventive measures can be taken to prevent future load shedding. As stated below:
- LESCO can prevent the installation of illegal connections
- It can maintain a proper check and balance
- It can also make amendments in formulating laws and policies as a future perspective of the company
Nepra closely monitors the irregular electricity shutdowns and takes notice. Check this link to see the notice.
Conclusion
As we all know Load Shedding is becoming a primary issue in the city. However, it is the job of the government and LESCO to sort out all these major electricity issues.
As a result, it can ensure the prosperity of the city.
But here’s the kicker!
Electricity is the basic need of every sector, whether it is trade, economy, banking, education, or agriculture that needs to be fulfilled. Whereas, the need for electricity supply can be fulfilled if more dams or reservoirs are built.
Due to this, grid stations would be able to produce and transmit sufficient electricity to all parts of the country.
Therefore, the development of dams is the most appropriate solution to solve the problem of load shedding.
Whereas, several other alternatives can also be used to decrease the electricity shortage in the country.
Alternates might include producing energy from other sources like windmills, solar panels, and renewable energy resources.
However, the use of modern policies, services, and technology will prevent the company from facing any kind of downfall in the future.